Introduction

Producing 1 ton of silicate cement requires grinding 2.5~2.9 tons of materials (including various raw materials, fuel, clinker, admixtures, and gypsum). The grinding operation in a dry-process cement production line consumes over 60% of the plant's total power, with raw meal grinding accounting for over 30%, coal grinding for approximately 3%, and cement grinding for approximately 40%.

Cement production uses limestone and clay as the main raw materials. After crushing and batching, the raw meal is ground in a vertical mill and then fed into a cement rotary kiln for calcination into clinker. The clinker is then mixed with an appropriate amount of gypsum and some admixtures or additives, and further ground into cement by a roller press and cement mill. Finally, it is transported out of the factory by a packaging machine or bulk carrier. The raw materials are dried and ground simultaneously, or dried first, ground into raw meal powder, and then fed into a dry rotary kiln for calcination into clinker. The main advantage is low heat consumption; the heat consumption of clinker in a dry kiln with a preheater is 3140–3768 J/kg.

Recommended Case

LATEST EQUIPMENT

Request a Quotation

Thank you for your interest in Our Industrial grinding, kiln, crushing. If you want to get help immediately, please chat online now. At the same time, you can also fill in your requirements, we will reply you in 24hours.

*
*
*
*
*
*
*
*
*

Request a Quotation

Thank you for your interest in Our Industrial grinding, kiln, crushing. If you want to get help immediately, please chat online now. At the same time, you can also fill in your requirements, we will reply you in 24hours.

*Product

*Material:

*
*
*
*
*
Back
Top

Copyright ©  LIMING Machinery CO., LTD. All rights reserved Privacy Policy