Pulverized Coal Preparation Project

Pulverized Coal Preparation Project

Equipment: Vertical Coal Mill

Material: Coal

Capacity: 50t/h

Output size: 200 mesh

Using time: October, 2015

Introduction

This project is mainly used for the preparation of pulverized coal for heating boilers. After the raw coal is ground by a coal mill, it is sorted by a separator. Unqualified pulverized coal will be ground again, Qualified finished products are collected and stored by pulse dust collector, The overall production capacity reaches 45-55T / H. This project takes the form of EPC, Set design, research and development, installation, training and integration, Ensure that the project is carried out in an orderly manner.

Recommended Case

LATEST EQUIPMENT

Request a Quotation

Thank you for your interest in Our Industrial grinding, kiln, crushing. If you want to get help immediately, please chat online now. At the same time, you can also fill in your requirements, we will reply you in 24hours.

*
*
*
*
*
*
*
*
*

Request a Quotation

Thank you for your interest in Our Industrial grinding, kiln, crushing. If you want to get help immediately, please chat online now. At the same time, you can also fill in your requirements, we will reply you in 24hours.

*Product

*Material:

*
*
*
*
*
Back
Top

Copyright ©  LIMING Machinery CO., LTD. All rights reserved Privacy Policy