Pulverized Coal Preparation Project
Equipment: Vertical Coal Mill
Material: Coal
Capacity: 50t/h
Output size: 200 mesh
Using time: October, 2015
Introduction
This project is mainly used for the preparation of pulverized coal for heating boilers. After the raw coal is ground by a coal mill, it is sorted by a separator. Unqualified pulverized coal will be ground again, Qualified finished products are collected and stored by pulse dust collector, The overall production capacity reaches 45-55T / H. This project takes the form of EPC, Set design, research and development, installation, training and integration, Ensure that the project is carried out in an orderly manner.