GBFS powder preparation project
Equipment: LM vertical roller mill
Material: Granulated Blast Furnace Slag
Capacity: 70-80t/h
Output size: 400 m²/kg Specific Surface Area
Using time: 2023
Introduction
Recently, news came from the customer's site that the 70-80 ton/hour slag powder preparation production line built by Liming Heavy Industry has officially started operation and reached its production target! The entire grinding production line was designed by Liming Heavy Industry, taking full account of the user's site conditions, with a reasonable process design, compact layout, and intelligent and environmentally friendly features!
Online Chat
Leave message